Refurbishment and upgrade of an existing pharmaceutical facility to accommodate a new process stream and operational requirements. The work was carried out during a building shut down.
Features:
- 3 floors. 1540 sq. m per floor
- Wet & Dry process production areas
- Dry area designed to GMP principles
- Dry areas Unclassified but engineered equivalent to Class 100,000
- Crystallisers, Dryers, Centrifuges, Magma Tank, Milling & Blending Rooms
- Stainless steel acoustic enclosures to Milling Rooms
- Zone 2 hazardous area classification
- Specialist DI Water self draining system
- External blast relief cladding (undertaken by others)
- New external Chiller building
- Directors Entrance
- New internal materials lift