Aker Solutions logo
HomeIndustries And ServicesSuppliersCorporate responsibilityMediaInvestor RelationsCareerAbout us
Aker Solutions: global engineering & construction services, technology products and integrated solutions
  
 

Projects


Aker Solutions has been involved in energy projects for more than 30 years, offering environmentally-friendly energy generation solutions. We have provided engineering services to steam and power generating facilities for the petroleum, electric utility, pulp and paper, chemical and metallurgical industries. Many of these projects utilised the output of waste heat recovery units combined with supplemental fuel as boiler fuel feed.

 


We also understand the safety, environmental and production requirements and challenges that plant operators experience.  As you would expect we are also cognisant with ASME and ANSI code requirements. 

We work in partnership with our clients, often from concept to commissioning, to produce the most effective solution to the challenges posed - whether they be economic, reliability, security, environmental or safety.

 

 

Sembcorp Utilities

We have the necessary skills to execute FEED Study and EPC work in the energy industry:

Projects Undertaken
Projects           Date                Location              Services Plant Capacity
SembCorp Utilities UK.pdf 2007 Teesside(UK) EPC 42MW (e) CHP Cogeneration
Conoco Phillips.pdf 2005 Teesside(UK) FEED+EPC Exisiting 62 MW (e) Power Plant upgraded to CHP
SembCorp Gas Turbine.pdf 2003 Teesside(UK) EPC 42 MW (e) CHP
Dalkia AstraZeneca .pdf 2001 Macclesfield (UK) EPC 23 MW (e) CHP & Steam Raising Plant
SITA.pdf 2000 Isle of Man (UK) EPC 65,000 tonnes per annum Energy from Waste Plant including 7.5 MW (e) Power Plant
Bridgewater Paper Company.pdf 1998 Bridgewater (UK) FEED+EPC 59 MW (e) CHP & Steam Raising Plant
Philips Petroleum.pdf 1998 Teesside (UK) EPC 62 MW (e) Power Generation
AM Paper - Combined Heat and Power Plant Sep 2005.pdf 1998 Skelmersdale, Lancashire (UK) Design, Supply, Install and Commision 7 MW (e) & 13 MW (th) for direct drying of product