Overtrawlable templates and manifolds

Aker Solutions offers a variety of overtrawlable templates and manifolds suitable for horizontal connections. We have delivered this technology to several projects in the North Sea.
We supplied two overtrawlable templates with manifolds to the Morvin project in 2009.

Contact

John Macleod
Vice President Tie-in & Structures

Phone: +47 32 85 90 20

Send message

Deliveries of overtrawlable templates with manifolds
 

Project

Where  

Number

Completed

 ENI Goliat

 North   
 Sea

 8

 2011

 DONG Oselvar

 North
 Sea

 1

 2010

 DONG Trym

 North
 Sea

 1

 2010

 Statoil Lavrans

 North
 Sea

 1

 2009

 Statoil Morvin

 North
 Sea

 2

 2007

 Statoil Kristin Q
 (phase 2)

 North
 Sea

 1

 2007

 Hydro Fram
 East

 North
 Sea

 2

 2005

 Statoil Kristin

 North
 Sea

 4

 2003

 Hydro Tune A

 North
 Sea

 1

 2001

 Hydro Oseberg
 South

 North
 Sea

 1

 1999

 Statoil Snorre

 North
 Sea

 1

 1992

 Norsk Hydro  
 TOGI

 North
 Sea

 1

 1990

 

Deliveries of overtrawlable manifolds

Project

Where

Number

Completed

 British
 Gas Juno

 North  
 Sea

 1

 2002

 Shell Garn   
 West

 North
 Sea

 1

 2001

 Hydro Visund
 Nord

 North
 Sea

 1

 2001

 Hydro Troll
 Olje

 North
 Sea

 5

 1994

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2011 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.