Spanning blocks 34/4 and 34/7 in the Tampen area of the Norwegian North Sea, the Snorre field, operated by Statoil has been producing oil and gas since August 1992. The Snorre development embraces two platforms, A and B.
“
For Snorre A, Aker Solutions delivered the detail design, topsides and tendon fabrication, platform integration, design and manufacturing of the risers, as well as suction anchor construction and installation
”
For Snorre A, Aker Solutions delivered the detail design, topsides and tendon fabrication, platform integration, design and manufacturing of the risers, as well as suction anchor construction and installation.
Snorre A is an integrated production, drilling and quarters (PDQ) unit. This tension leg platform (TLP) is moored to the seabed by steel tethers. Stabilised oil and gas from Snorre A is piped to the nearby Statfjord A platform for final processing. The oil is then loaded into shuttle tankers, while the gas is transported on to continental Europe through the Statpipe/Norpipe system.
Aker Solutions also delivered Snorre B, a semi-submersible production platform, in 2001, as a complete engineering, procurement and construction (EPC) contract.