The Adriatic LNG project is the first offshore LNG regasification terminal in the world. It is installed offshore Rovigo, Italy, and was ready for operation in 2009. The termina...
-
The Beryl A platform was installed in 1975 and has storage in the base, off-loading to two articulated loading buoys. The Beryl A platform has 3 shafts, drilling, processing and...
-
The Brent B platform was installed in 1975 and the field has been in production since June 1978. Brent B and D were constructed by the then Norwegian Contractors, now Aker...
-
The Brent field has been developed with four fixed platforms where Brent B and D were constructed by Norwegian Contractors, now Aker Solutions. Brent D was installed in 1976.
-
Draugen was developed for Shell in 1993 and was the first oil field in operation north of the 62 degree latitude. The platform produces 250% more barrels of oil a day than...
-
Frigg gas field straddles the UK/Norwegian median line, was developed in phases with a complex of five platforms plus a flare stack, exporting through the Total-operated twin 32...
-
Gullfaks A was installed in the North Sea in 1986 and started production in December the same year. In recent years the platform has been extended with the satellite subsea well...
-
Production on Gullfaks B started on 29 Feburary 1988. Gullfaks A, B and C are all concrete gravity based platforms. The Gullfaks B platform is a 172 m high concrete gravity base...
-
Gullfaks C started production 4 November 1989. The platform mainly serves as a oil and gas recipient from platforms as Gullfaks A and other fields, such as Vigdis and Visund. At...
-
The TPG 500 platform consist of three-leg jackup drilling unit that mounted on a concrete base. The concrete base provides support for the jackup and functions as a drilling...
-
The construction of the Heidrun Tension Leg Platform (TLP) for Conoco began in 1991. The platform was installed in Haltenbanken in June 1995 and is operated by Statoil.
-
The Hibernia GBS was constructed to resist impact from icebergs and harsh weather conditions ensuring a continous and safe operation.
-
Oseberg A was installed in the North Sea in 1988 and since then been extended with Oseberg B and D which are steel structures. Oseberg A now acts as the field center where gas i...
-
Aker Solutions has constructed and installed two concrete gravity based platforms for the Sakhalin II project. As the project advance into its second phase, all-year drilling an...
-
Sleipner A was designed for shallow water and a large topside weight resulting in a large base. The platform was installed in October 1993.
-
Offshore platform in the North Sea
-
The Statfjord field was discovered in 1974 and is the largest oil discovery in the North Sea. The field is divided by the economic border between UK and Norway. The base has 3...
-
Statfjord B started production 3 years after Statfjord A, in 1982. The Statfjord B platform supplies Kårstø with oil and gas. The concrete structure is 175m high, has 4 shafts a...
-
Statfjord C was installed in June 1984 and started production in 1985. The platform is connected to satellite subsea wells in the north and east. The base has 4 shafts, 24 cells...
-
Troll A substructure is 379m high and is the world's tallest and heaviest offshore platform, the fourth highest manmade structure and the largest structure ever moved by man. Th...