Brent B
The Brent B platform was installed in 1975 and the field has been in production since June 1978. Brent B and D were constructed by the then Norwegian Contractors, now Aker Solutions. The platform has 3 shafts,19 cells, drilling, production, accomodation and compression for the FLAGS pipeline.
|
Description
|
Condeep 3/19. Drilling, production, storage, accommodation, main compression platform for FLAGS line.
|
|
Construction site
|
Stavanger, Norway
|
|
Installation site
|
The Brent field, the North Sea, British sector
|
|
Topside, operating weight
|
29 014 tonnes
|
|
Total weight of structure
|
195 257 tonnes
|
|
Total height of concrete structure
|
165 m
|
|
Total height of platform with deck
|
251 m
|
|
Concrete
|
65 000 m3
|
|
Topside production capacity
|
150 000 bbls
|
|
Storage capacity
|
1 100 000 bbls
|
|
Well slots
|
38
|
|
Tow to field / installation on field
|
August 1975
|