Frigg TCP-2
Frigg gas field straddles the UK/Norwegian median line, was developed in phases with a complex of five platforms plus a flare stack, exporting through the Total-operated twin 32" trunklines to St. Fergus. The concrete gravity base is hexagonal and has 19 cells and 3 shafts to support the deck.
|
Description
|
Concrete gravity with hexagonal 3/19.
|
|
Construction site
|
Åndalsnes, Norway
|
|
Installation site
|
The Frigg field, the North Sea
|
|
Topside, operating weight
|
21 500 tonnes
|
|
Total weight of structure
|
306 000 tonnes
|
|
Total height of concrete structure
|
126 m
|
|
Total height of platform with deck
|
165 m
|
|
Concrete
|
60 000 m3
|
|
Topside production capacity
|
60 000 000 m3/d gas
|
|
Tow to field / installation on field
|
June 1977
|