Frigg gas field straddles the UK/Norwegian median line, was developed in phases with a complex of five platforms plus a flare stack, exporting through the Total-operated twin 32" trunklines to St. Fergus. The concrete gravity base is hexagonal and has 19 cells and 3 shafts to support the deck.

Description

Concrete gravity with hexagonal 3/19.

Construction site

Åndalsnes, Norway

Installation site

The Frigg field, the North Sea

Topside, operating weight

21 500 tonnes

Total weight of structure

306 000 tonnes

Total height of concrete structure

126 m

Total height of platform with deck

165 m

Concrete

60 000 m3

Topside production capacity

60 000 000 m3/d gas

Tow to field / installation on field

June 1977

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2012 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.