Gullfaks B

Production on Gullfaks B started on 29 Feburary 1988. Gullfaks A, B and C are all concrete gravity based platforms. The Gullfaks B platform is a 172 m high concrete gravity base platform with 3 shafts, 19 cells and a T-shaped deck. The base is not used for oil storage, but filled with water.

Description

Condeep with 3 shafts, 19 cells. Production, Drilling, accommodation. Water injection.

Construction site

Stavanger, Norway

Installation site

The Gullfaks field, the North Sea

Topside, operating weight

25 000 tonnes

Total weight of structure

198 000 tonnes

Total height of concrete structure

172 m

Total height of platform with deck

209 m

Concrete

105 000 m3

Topside production capacity

150 000 bopd

Storage capacity

No oil storage

Well slots

42

Topside installation on substructure

May 1987

Tow to field / installation on field

August 1987

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2012 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.