Oseberg A

Oseberg A was installed in the North Sea in 1988 and since then been extended with Oseberg B and D which are steel structures. Oseberg A now acts as the field center where gas is sent to the Sture teminal. Condeep with 4 shafts and 30 cells in the concrete gravity base, modified for shallower water depth. Processing and accommodation.

Construction site

Stavanger and Stord, Norway

Installation site

The Oseberg field, North Sea

Tow-out weight

800 000 tonnes

Substructure, operating weight

1,25 million tonnes

Concrete

120 400 m3

Reinforcement

32 000 tonnes

Total height of concrete structure

137,7 m

Topside, operating weight

60 000 tonnes

Total height of platform with deck

193 m

Topside production capacity

240 000 bopd and 6*106 Sm3/d

Topside installation on substructure

July 1987

Tow to field / installation on field

June 1988

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2011 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.