Sleipner A
Sleipner A was designed for shallow water and a large topside weight resulting in a large base. The platform was installed in October 1993.
|
Construction site
|
Hinna, Stavanger, Norway
|
|
Installation site
|
The North Sea
|
|
Topside, weight during tow
|
54 000 tonnes
|
|
Topside, operating weight
|
40 500 tonnes
|
|
Concrete
|
75 000 m³
|
|
Reinforcement
|
22 000 tonnes
|
|
Prestressing cables
|
250 tonnes
|
|
Solid Ballast (sand)
|
280 000 tonnes
|
|
Contract award
|
July 1988
|
|
Installation of deck
|
September 1992
|
|
Tow to field / installation on field
|
July 1993
|