Statfjord C
Statfjord C was installed in June 1984 and started production in 1985. The platform is connected to satellite subsea wells in the north and east. The base has 4 shafts, 24 cells, oil storage and provides facilities for drilling, production and accomodation.
|
Description
|
Condeep 4 / 24. PDQ, Storage
|
|
Construction site
|
Stavanger, Norway
|
|
Installation site
|
The Statfjord field, the North Sea
|
|
Topside, operating weight
|
52 000 tonnes
|
|
Total weight of structure
|
643 700 tonnes
|
|
Total height of concrete structure
|
175 m
|
|
Total height of platform with deck
|
290 m
|
|
Concrete
|
126 000 m3
|
|
Topside production capacity
|
300 000 bopd and 6500 million Sm3/d
|
|
Storage capacity
|
1 900 000 bbl
|
|
Well slots
|
42
|
|
Topside installation on substructure
|
February 1984
|
|
Tow to field / installation on field
|
June 1984
|